OVERALL PERFORMANCE OF WESCO FOR FY APRIL'06-MAR'07
   
Period
WESCO
Sl. No. LICENSEES April'06-June'06 July'06-Sep'06 Oct'06-Dec'06 Jan'07-Mar'07 For 2006-07
  Achievement % of the licensees in the following service area Minimum % target fixed by the comission          
1 Rectification of fuse-off call within 6 hrs. of receiving the complaint in urban areas
90
99.97
99.94
100
100
100
2 Rectification of fuse-off call within 24 hrs. of receiving the complaint in rural areas
90
99.95
99.94
99.29
100
100
3 Restoration of line breakdown within 12 hrs. of receiving the complaint in urban areas
95
100
100
100
100
100
4 Restoration of line breakdown within 24 hrs. of receiving the complaint in rural areas
95
100
100
100
100
100
5 Replacement of Distribution Transformer within 24hrs. Of receiving the complaint in urban areas
95
100
100
100
100
100
6 Replacement of Distribution Transformer within 48hrs. Of receiving the complaint in rural areas
95
98.37
100
98.75
98.81
99.75
7 Completing the work within 12hrs. of the scheduled outage before 5PM/6PM
90
N.A
N.A
N.A
N.A
N.A
8* No. of hourly measurement in which the supply frequency went beyond + 3%            
9* No. of cases in which voltage at the point of commencement of supply exceeded 3% of the voltage limits fixed under I.E. Rules,1956            
10 Rectification of street light fault within 6 hrs. of receiving the complaint
90
90
90
90
90
90
11 No. of faulty bills prepared as a percentage of total no. of bills issued
0.1
0.9
0.9
0.1
0.9
0.1
12 No. of faulty meters prepared asa percentage of total no. of existing meters
5
5
5
5
5
5
13 Total no. of interruption each lasting more than 5 minutes faced by 1 Kw connected load
 
7.97
8.247
8.583
6.115
30.915
14 Total no. of interruption each lasting less than 5 minutes faced by 1 Kw connected load
 
8.19
9.523
8.055
6.663
32.431
15 Total duration in minutes of each 1Kw connected load
 
222.39
228.912
224.951
157.718
833.971
16 No.of accident cases            
Fatal Human
7
4
5
2
18
Fatal Animal
5
5
6
4
20
Non fatal Human
4
9
4
1
18
Non fatal animal  
0
0
1
0
1
* The records are available at 132KV & 220 KV grid S/S.We are not able to furnish the data as it is not available with us.