Period |
WESCO |
| Sl. No. |
LICENSEES |
April'06-June'06 |
July'06-Sep'06 |
Oct'06-Dec'06 |
Jan'07-Mar'07 |
For 2006-07 |
| |
Achievement % of the licensees in the following service area |
Minimum % target fixed by the comission |
|
|
|
|
|
| 1 |
Rectification of fuse-off call within 6 hrs. of receiving the complaint in urban areas
|
90 |
99.97 |
99.94 |
100 |
100 |
100 |
| 2 |
Rectification of fuse-off call within 24 hrs. of receiving the complaint in rural areas
|
90 |
99.95 |
99.94 |
99.29 |
100 |
100 |
| 3 |
Restoration of line breakdown within 12 hrs. of receiving the complaint in urban areas
|
95 |
100 |
100 |
100 |
100 |
100 |
| 4 |
Restoration of line breakdown within 24 hrs. of receiving the complaint in rural areas
|
95 |
100 |
100 |
100 |
100 |
100 |
| 5 |
Replacement of Distribution Transformer within 24hrs. Of receiving the complaint in urban areas
|
95 |
100 |
100 |
100 |
100 |
100 |
| 6 |
Replacement of Distribution Transformer within 48hrs. Of receiving the complaint in rural areas
|
95 |
98.37 |
100 |
98.75 |
98.81 |
99.75 |
| 7 |
Completing the work within 12hrs. of the scheduled outage before 5PM/6PM
|
90 |
N.A |
N.A |
N.A |
N.A |
N.A |
| 8* |
No. of hourly measurement in which the supply frequency went beyond + 3% |
|
|
|
|
|
|
| 9* |
No. of cases in which voltage at the point of commencement of supply exceeded 3% of the voltage limits fixed under I.E. Rules,1956 |
|
|
|
|
|
|
| 10 |
Rectification of street light fault within 6 hrs. of receiving the complaint
|
90 |
90 |
90 |
90 |
90 |
90 |
| 11 |
No. of faulty bills prepared as a percentage of total no. of bills issued
|
0.1 |
0.9 |
0.9 |
0.1 |
0.9 |
0.1 |
| 12 |
No. of faulty meters prepared asa percentage of total no. of existing meters
|
5 |
5 |
5 |
5 |
5 |
5 |
| 13 |
Total no. of interruption each lasting more than 5 minutes faced by 1 Kw connected load
|
|
7.97 |
8.247 |
8.583 |
6.115 |
30.915 |
| 14 |
Total no. of interruption each lasting less than 5 minutes faced by 1 Kw connected load
|
|
8.19 |
9.523 |
8.055 |
6.663 |
32.431 |
| 15 |
Total duration in minutes of each 1Kw connected load
|
|
222.39 |
228.912 |
224.951 |
157.718 |
833.971 |
| 16 |
No.of accident cases
|
|
|
|
|
|
|
| Fatal Human |
|
7 |
4 |
5 |
2 |
18 |
| Fatal Animal |
|
5 |
5 |
6 |
4 |
20 |
| Non fatal Human |
|
4 |
9 |
4 |
1 |
18 |
| Non fatal animal |
|
0 |
0 |
1 |
0 |
1 |
* The records are available at 132KV & 220 KV grid S/S.We are not able to furnish the data as it is not available with us.
|